S.No | Title | PI Name | Institute Name | Sanction with Date | Duration | Cost(Rs. in lakhs) | Status | Major Equipments & Abstract |
---|---|---|---|---|---|---|---|---|
120 | A Scoping proposal to build a two dimensional ice-flow model for basin scale glacier simulation in the Himalaya. | Dr. Argha Banerjee | Earth and Climate Science, Indian Institute of Science Education and Research ,Pune | MoES/PAMC/H&C/80/2016-PC-II 25 October, 2016 |
2 Years | 10.26 | Completed | Abstract i). One Desktop |
119 | Integration of Geo-chemical and Hydrological Modelling to quantity the present and Furture of Ganga River Hydrology in the Himalayas. | Dr. Indra Sekhar Sen | Indian Institute of Science Education & Research | MoES/PAMC/H&C/79/2016/PC-II 27th September, 2018 |
3 Years | 99,42,072 | On-going | Abstract (i) Ion Chromatography (ii) Workstation |
118 | Establishing a Critical Zone Observatory (CZO) in the Ganga Basin | Dr.Debajyoti Paul | Indian Institute of Technology Kanpur | MoES/PAMC/H&C/63/2015/PC-II 20th November, 2015 |
3 Years | 74.64 | Completed | Abstract (i) Automatic weather gauges (ii) Theta Probe (iii) Net radiometer (iv) Soil heat flux plates (v) Hydra probe (vi) Interception losses (vii) TDR Probe (viii) Automatic ground water level sensor (ix) Flow measuring stations (x) Leaf Area Index (xi) Sap flow meters |
117 | Measurement and modelling of Evapotransiration and other Hydrological process in Lesser Himalayas | Dr. Manish Kumar Nema | National Institute of Hydrology, Roorkee | MoES/PAMC/H&C/62/2015/PC-II 14th December, 2015 |
3 Years (+2 Years) | 94,19,600 | Completed | Abstract (i)Micro-meteorological monitoring system (ii) Soil Monitoring Station (iii) Hand held LAI meter (iv) Toughbook Laptop |
116 | Estimation of glacier mass balance,glacier dynamics and surface flow using UAVS (Unmanned Aerial Vehicles) in Baspa basin, Himachal Pradesh | Dr. Rajesh Kumar | Department of Environmental Science Sharda University, Greater Nodia | MoES/PAMC/H&C/61/2015-PC-II 29 March, 2016 |
3 Years | 49,73,053 | Completed | Abstract i) Unmanned Aerial Vehicle with inbuilt high resolution camera and GPS ii). Laptop |
115 | A 100 ka Glaciation-deglaciation history of Ladakh: its comparison with sutluj valle and signatures in the alluvial plains of NW India. |
Dr. Naresh Chandra Pant | Centre of Advance studies in Geology, University of Delhi | MoES/PAMC/H&C/51/2013/PC-II 27th March, 2017 |
3 Years | 84,82,000 | Completed | Abstract (i) Benchtop SEM (ii) Centrifuge |
114 | Isotope Techniques to Evalute the seasonal and inter-annual variation of Glacial and snowmelt discharge in the Gangas River at Gumkukh and Mana. | Dr. Inder Sekhar Sen | Indian Institute of Technology ,Kanpur | MoES/PAMC/H&C/47/2013-PC-II 25 September, 2014 |
18 Months | 16,72,000 | Completed | |
113 | Impact of Forecast Cover Changes on Groundwater Resources in Uttara Kannada District, Karantaka |
Dr.B.Venkatesh | National Institute of Hydrology , Hard Rock Regional Centre, Belgam, Karnataka | MoES/PAMC/H&C/45/2013/PC-II 04th September, 2018 |
3 Years | 90,42,450 | On-going | Abstract NIH, Belgaum (i) Evaporimeter (ii) Automatic weather station (iii) DWLRs/AWLR (iv) Soil moisture sensore with data logger (v) Piezometers (vi) Infiltometers (vii) Water leverl measuring device (viii) GPS (ix) Notches College of Forestry, Sirsi (i) GPS TERI, Bangalore (i) Software and Imageries NIE, Mysore (i) DWLRs/AWLR (ii) Guelph permeameter (iii) Soil moisture sensores with data logger |
112 | Establishment of centre for water Research |
Prof. Pradeep P. Mujumdar | Department of Civil Engineering, Indian Institute of Science, Bangalore | MoES/PAMC/H&C/41/2013/PC-II 28th March, 2018 |
5 Years | 468.072 | On-going | Abstract (i) Computer Software Network |
111 | Assessment of Environmental Flows for Himalayan Rivers | Dr. Sharad Jain | NIH, Roorkee | MoES/PAMC/H&C/38/2013-PC-II 25th September, 2014 |
1 Years | 13,74,300 | Completed |